ABB Power Tower, Baden
Engineering building ABB Power Tower with around 1,300 office workplaces and 509 parking spaces.
The engineering building ABB Power Tower was completely planned and constructed by Implenia after it won a competition as a total contractor. The striking and ambitious new building is designed for around 1,300 office workplaces. There is also a production hall and a company restaurant on the elevated ground floor. A training centre with auditorium is located above the restaurant on three floors. There are 509 parking spaces on the underground levels. The enormous cube-shaped building is awe-inspiring from the outside with its clearly structured, almost completely glass façade. The building technology also meets high standards.
Map
Specific figures
CustomerABB Immobilien AG, 5400 Baden
Total contractorImplenia General Contracting Ltd.
Construction costsCHF 119.3 million
Construction schedule- Start of construction: October 2000
- End of construction: handover October 2002
- Architect: Diener & Diener Architekten AG, 4051 Basel
- Structural engineer: Ingenieurgemeinschaft Proplaning AG, 4055 Basel; E. Basler & Partner AG, 8008 Zurich
- Building technology: Proplaning AG, 4055 Basel
- Electrical planner: Signorell Elektroengineering AG, 4055 Basel