Bucher Hydro Valley, Neuheim
- Implementation of an optimum factory layout for a "breathing factory" in a sophisticated landscape, integrating the existing production halls.
- Operations must be maintained during construction.
Map
Divisions performance
- Feasibility study
- Operational and logistics planning
- General planning
Contact for questions about the project | |
|---|---|
| Reuss Engineering AG | |
| Telefon: +41 41 455 64 40 | |
| Head Office | |

