Disposal gallery, Visp
Project management and realisation of the heading and excavation work for the disposal gallery in Visp (4.75 m diameter) as total contractor. The gallery is used as a conveyor belt gallery for the Visp South bypass. Tunnel length: Heading with tunnel boring machine 2,460 m. Machine-assisted heading in unconsolidated rock 60 m.
- Mechanical hard rock heading with gripper machine 4.75 m diameter, (Robbins 142-212)
- Conveyor belt waste disposal
Map
Specific figures
Contract valueCHF 16.5 million
Construction period2004 - 2006
Length2520 m
Total excavated surface17.7 m2
Contact for questions about the project | |
|---|---|
| Implenia Industrial Construction | |
| Telefon: +41 43 233 39 90 | |
| E-Mail: Sandra.Guetg@implenia.com | |