Gotthard Base Tunnel, lot 360, Sedrun Tunnel
- Railway tunnel with two single-track bores, each 9.0 km long, heading cross-section 60-134 m2 (full-face), cross-over points every 312 m.
- Multifunction station with lengthwise and cross-over chambers, four tunnel cross-over expansions (heading cross-section up to 230 m2), tunnel cross-over connections, side galleries, ventilation galleries and 14 ventilation shafts, 4 waiting chambers.
- Access through access galleries approx. 1 km in length and 2 shafts approx. 800 m deep.
- This is an extremely complex installation.
- Drill and blast heading, supported using shotcrete, anchors and nets.
- Special heading in the high-pressure zones (TZM North), supported with deformable steel installation, anchors, shotcrete and solid working face supports
- In-situ cast concrete internal vaults
- Shaft II: Raise drill with subsequent expansion by shaft boring machine (7 m diameter)
Map
Specific figures
Order valueCHF 1,550 million
Construction period2002 - 2014
Length18,000 m
Total excavated surface60 - 134 m2
Contact for questions about the project | |
|---|---|
| Implenia Industrial Construction | |
| Telefon: +41 43 233 39 90 | |
| E-Mail: Sandra.Guetg@implenia.com | |