High-rise ensemble Quadro-Platz, Zurich
A high-rise ensemble comprised of four buildings with four high-rises of different heights has been under construction in Zurich-Nord since 2000. Upscale, flexible office space on the upper floors and retail space on the ground floor are clustered around the central Quadro-Platz.
The entire complex was developed together with the architects ARGE Atelier WW/Max Dudler. The high-rise ensemble, which is built on a square grid, is unique with its uniform architecture and use of material. Energy efficiency, a high level of flexibility and high-grade materials give rise to many customer benefits. The central location in Zurich-Nord, its good access to public transportation and good infrastructure for individual motorised transportation enhance the complex's function as a centre in the Leutschenpark quarter. The last phase is scheduled for completion in 2013.
Map
Sustainability and ecology
The basic design meets the Minergie standard. Excellent access to public transportation and good infrastructure for individual motorised transportation.
Divisions performance
- Project development
- Identification of users
- Identification of investors
- Total contractor
Specific figures
Construction volumeCHF 247,000.-
Gross floor space73,000 m2
Number of floors in the highest building28 upper floors, 4 lower floors
Number of parking spaces522
Number of workplacesApprox. 4,000