Hubelmatt Tunnel of the central railway, Lucerne
The 550-metre long Hubelmatt Tunnel is part of the dual tracking and lowering of the central railway. The Hubelmatt Tunnel heading stretches from the Allmend side, under the Hubelmatt hill, to the north portal, at the junction of Geissensteinring and Sternmattstrasse.
- Drilling of a 3.9 m diameter pilot gallery
- Calotte excavation with roadheader machine (TSM)
- Bench and floor excavation with TSM
- Single-skin tunnel shotcrete construction
Map
Specific figures
Order valueCHF 18.4 million
Construction period2009 - 2011
Length550 m
Total excavated surface90 m2
Contact for questions about the project | |
|---|---|
| Implenia Industrial Construction | |
| Telefon: +41 43 233 39 90 | |
| E-Mail: Sandra.Guetg@implenia.com | |