Letzigrund stadium, Zurich
Construction of the new Letzigrund stadium to replace the existing sports facility.
- Concrete production from excavated material (Limmat gravel, unwashed) in in-situ cement facility
- Dyed concrete (anthracite) - 6,500 m3
- Scratched concrete surface - 4,800 m2
Map
Divisions performance
Master builder work.
Specific figures
ConcreteMaster builder work.
Formwork55,000 m2
Reinforcement3,500 tonnes