Oenzberg Tunnel, Aeschi
Mattstetten-Rothrist railway 2000, Oenzberg bei Wanzwil junction.
- 1 double-track tunnel of 3,170 m in length, of which 1,970 m in molasse, west and east cut-and-cover section 880 m (Oenzberg Tunnel). Unconsolidated rock 320 m.
- 2 single-track tunnels of approximately 510 m each. Molasse section 750 m, cut-and-cover section 270 m (Wolfacher North/South).
- Inkwil groundwater tank, 560 m long.
- Oenzberg Tunnel with mixed-shield TBM, 12.33 m diameter
- Molasse section heading in full face technique (dry)
- Unconsolidated section with hydro-shield heading
- Excavation cross section approx. 120 m2
Map
Specific figures
Contract valueCHF 200 million
Construction period2000 - 2004
Length2290 m
Total excavated surface119.4 m2
Contact for questions about the project | |
|---|---|
| Implenia Industrial Construction | |
| Telefon: +41 43 233 39 90 | |
| E-Mail: Sandra.Guetg@implenia.com | |