Innovation in tunnelling - Compression element - Vision Underground
assembly (approx. 5 minutes per element) Flexible adjustment of the stress-strain behavior and thus targeted design of the removal resistance thanks to modular sandwich construction Flexible adjustment of the dimensions, making variable cut-off lengths possible High resistance to tilting in the event of a
Focus future
Vision Underground